Uptime Math That Matters: SLA, SLO and Error Budgets Explained
Understand what 99.9% availability really allows, how to calculate uptime correctly, and how an error budget turns a reliability target into a practical product decision.
Daniel Brooks
Reliability consultant helping product and engineering teams translate service-level data into sustainable operating decisions.
Availability percentages look precise, but they are easy to misuse. A dashboard can show 99.95% while customers remember a failed launch, a broken checkout, or an outage during peak hours. The percentage is useful only when the measurement window, monitored journey, exclusions, and business consequences are clear.
SLA, SLO and SLI are different tools
- SLI — Service Level Indicator: the measurement, such as the proportion of successful HTTP requests.
- SLO — Service Level Objective: the internal target for that indicator, such as 99.9% successful requests over 30 days.
- SLA — Service Level Agreement: the external commitment and the remedy if it is missed.
A healthy design usually keeps the internal SLO stricter than the contractual SLA. That gap gives the team time to react before a customer commitment is breached.
How much downtime does each target allow?
| Target | 30-day allowance | 365-day allowance |
|---|---|---|
| 99% | 7 h 12 min | 3 d 15 h 36 min |
| 99.9% | 43 min 12 sec | 8 h 45 min 36 sec |
| 99.95% | 21 min 36 sec | 4 h 22 min 48 sec |
| 99.99% | 4 min 19 sec | 52 min 34 sec |
The formula is straightforward: allowed downtime equals the measurement-window duration multiplied by one minus the target. The difficult part is choosing what counts as unavailable.
Define a useful availability indicator
For many public websites, a simple external check is a good starting point: the endpoint must respond within a defined timeout and return an acceptable status code. For an application, the indicator should follow customer value more closely. A homepage returning HTTP 200 does not prove that sign-in or payment works.
A request-based indicator is often more representative:
Define “successful” explicitly. Decide whether slow responses count as failures, which status codes are acceptable, how bot traffic is treated, and whether planned maintenance is included. Document these choices beside the chart.
The error budget connects reliability and delivery
An error budget is the amount of unreliability permitted by the SLO. With a 99.9% monthly target, the budget is 0.1% of valid requests or roughly 43 minutes in a time-based model. As failures consume the budget, the organization changes its behavior.
- Budget healthy: continue normal product delivery while maintaining safeguards.
- Budget burning quickly: slow risky releases and prioritize the largest reliability contributors.
- Budget exhausted: focus planned capacity on recovery and prevention until the service is back within policy.
This is more useful than declaring that reliability is always the top priority. It creates an agreed signal for when feature velocity should yield to stability.
Track burn rate, not only the final percentage
A monthly uptime percentage can hide a fast-moving incident early in the window. Burn rate shows how quickly the service is consuming its budget. If a service with a 0.1% failure budget is currently failing 1% of requests, it is burning budget at 10× the sustainable rate.
Use two alert windows: a short window catches severe incidents quickly, while a longer window confirms sustained degradation and reduces noise. This is more actionable than alerting whenever a single request fails.
Common calculation mistakes
- Averaging percentages: combine successful and total checks first; do not average daily percentages with different sample sizes.
- Ignoring missing checks: monitoring gaps are unknown, not automatically healthy time.
- Measuring only the easiest endpoint: monitor the journeys that create customer value.
- Changing exclusions after an incident: define maintenance and dependency policies before they affect the result.
- Using one target for every service: match reliability investment to business criticality.
A practical starting policy
Choose one critical user journey, define success and latency, set a 28- or 30-day objective, and review it monthly. Add the allowed downtime and current budget consumption to the report. When the target is repeatedly easy to meet, decide whether the objective is too loose or whether engineering effort can move elsewhere. When it is repeatedly missed, improve the system before promising another nine.